Pelco VMX200 operation manual A D D E N D U M, Addendum No. C1525M-B-ADDEN, Date March

Models: VMX200

1 1
Download 1 pages 61.76 Kb
Page 1
Image 1
A D D E N D U M

A D D E N D U M

Addendum No.: C1525M-B-ADDEN

Date: March 5, 2003

Manual Affected: VMX200 Video Management System – C1525M-B

Manual Update: The following instructions replace the steps listed on page 11 of the Installation/Operation manual for installing the VMX200 in a 19-inch equipment rack.

Refer to Figure 1 for the following instructions.

1.Attach the rack ears to the front sides of the VMX200 with the 10-32 x .250-inch screws.

2.Attach the brackets to the sides of the equipment with the 8-32 x .250-inch screws.

3.Fasten the front and rear support rails together with the 8-32 x .375-inch screws with lock washers.

4.Attach the support rails to the equipment rack with the 10-32 x .375 inch screws.

5.Slide the brackets on the equipment onto the support rails.

6.Fasten the rack ears to the equipment rack with the 10-32 x .750-inch screws and washers.

Figure 1. Installation of Support Rails

Pelco World Headquarters • 3500 Pelco Way, Clovis, California 93612-5699 USA • www.pelco.com

USA & Canada: Tel: 800/289-9100 • Fax: 800/289-9150

Addendum No.: C1525M-B-ADDEN ® International: Tel: 1-559/292-1981 • Fax: 1-559/348-1120

Page 1
Image 1
Pelco VMX200 operation manual A D D E N D U M, Addendum No. C1525M-B-ADDEN, Date March