Pella 80GY0102 warranty 3SETTING and Fastening the Window

Models: 80GY0102

1 10
Download 10 pages 4.67 Kb
Page 5
Image 5

3SETTING AND FASTENING THE WINDOW

"

TWO OR MORE PEOPLE WILL BE

REQUIRED FOR THE FOLLOWING STEPS.

A.Insert the window from the exterior of the building. Place the bottom of the window on the spacers at the bottom

of the opening, then tilt the top into position. Center the window between the sides of the opening to allow clearance for shimming, and insert one roofing nail in the first hole from the corner on each end of the top nailing fin. These are used to hold the window in place while shimming it plumb and square.

B.Plumb and square window. Place shims between the window frame and the rough opening at each installation screw hole.

Adjust the shims as required to plumb and square the window in the opening.

Windows with Installation Clips only: Shim between each installation clip and the rough opening.

Note: DO NOT over shim.

C.Check the interior reveal. Make sure the measurement from the interior face of the

window to the interior face of the wall

is equal at several points around the $ window.

Note: If the dimensions are not equal, check to make sure the fins are folded out to 90° at all points.

#

NN



*/$)&4



 

 



 





 



 

 





 

 

 

 

 

 

 

 



 

 

 

 

 

 

*OUFSJPS

#

D. Check window operation (vent units only). Remove the shipping spacers, unlock the window and open and close it a few times to check for proper operation. Close and lock the window.

Note: If there are any problems with the operation of the window,

&

recheck shim locations and adjust for plumb and square.

E. Fasten the window to opening by driving 2" galvanized roofing nails into each pre-punched hole in the nailing fin.

Note: Make sure the fin corner is lying as flat as possible.

4INTEGRATING THE WINDOW TO THE WATER RESISTIVE BARRIER

Note: The flashing tape must be applied approximately 1/2" onto the frame cladding at the jambs and head. Pre-folding the tape at 1/2" before removing the paper backing will make it easier to apply the tape correctly. If the siding is less than 1/2" thick, adjust the dimension of the fold so the exterior sealant line will cover the exterior edge of the tape.

Page 5
Image 5
Pella 80GY0102 warranty 3SETTING and Fastening the Window, Recheck shim locations and adjust for plumb and square