Step Connect End Rail Clamps,

120" Tubing and Elbows

1.Gather 4 end rail clamps, 2 - 20" tubes, 2 elbows, 2 carriage bolts and 2 nuts.

2.Insert 1 elbow into 1 - 20" tube.

3.Beginning on the gate panel side, attach 2 end rail clamps to top frame of the kennel panel. Position

end rail clamps in the center of the gate panel.

4.Install 20" tube with elbow into end rail clamps and tighten with 1 carriage bolt and 1 nut.

5.Repeat steps 2 through 4 on opposite side of kennel. Loosely secure the end rail clamps to the kennel frame.

__________________________________________________________________________________________________

Step Connect Plain and Swedged Tubing

21. Gather 1 plain 41.5" tube and 2 swedged 41" tubes. 2. Beginning on the gate panel side, insert one swedged

tube into elbow. Then insert plain tube over swedged tube. Finish by inserting remaining swedged tube into plain tube and opposite elbow.

3. Tighten end rail clamps after all tubing is assembled.

4

1-888-632-4453

Page 4
Image 4
Petsafe E-Z Roof manual Step Connect End Rail Clamps Tubing and Elbows, Step Connect Plain and Swedged Tubing