Using the enclosed mounting template, place the diagram against the wall and mark four locations on the wall where the mount is to be Installed.

With the help of another person, place the mount against the wall and level it using the bubble guide.

While another person holds the mount in place, mark four locations on the wall where the mount is to be installed.

Set the mount aside and drill a 12mm pilot hole at each marked location. Remove any excess dust from the holes.

Insert a Concrete Anchor (P) into each hole so that it is flush with the concrete surface.A hammer can be used to lightly tap the anchors into place if necessary.

Place the mount back against the wall and secure it using the lag bolts (Q) and lag bolt washers (R) provided. Do not over-tighten these bolts and do not release the mount until all bolts are in place.

Once all (4) lag bolts are in place you must tighten each one. Be sure not to over tighten. 2

2

3.3 Attaching the arms to the display

BWarning

Use extra care during this part of the installation. If possible, avoid placing your display facedown as it may damage the viewing surface.

DNote

Your mount comes with a selection of bolt diameters and lengths to accommodate a wide variety of display models. Not all of the hardware in the kit will be used.

1Determine the correct length of bolt to use with your display by first examining the back of your display.

A.If your display has a flat back:You will use one of the shorter bolts (A, D, G, or J) from the hardware kit. 3

3

B.If your display has a curved or recessed back: You will use one of the longer bolts (B, E, H, or K) along with a spacer (M or N). 4

D Note

4

If the concrete wall is covered by a layer

 

of plaster or drywall, the concrete anchor

 

must pass completely through the layer to

 

rest flush with the concrete surface.

 