Chapter 2 UNPACKING AND SETUP
This chapter provides unpacking and setup information for the Switch.
Unpacking
Open the shipping cartons of the Switch and carefully unpacks its contents. The carton should contain the following items:
One
One External power adapter (optional, vary on model)
This User’s manual
If any item is found missing or damaged, please contact your local reseller for replacement.
Setup
The setup of the Switch can be performed using the following steps:
The surface must support at least 1.5 kg for the Switch.
[Option] Confirm with the network administrator for the information of the POE device if the Switch is plan to connect with a 802.3af
[Option] The power outlet should be within 1.82 meters (6 feet) of the Switch.
[Option] Visually inspect the DC power jack and make sure that it is fully secured to the power adapter.
Make sure that there is proper heat dissipation from and adequate ventilation around the Switch.
Do not place heavy objects on the Switch.
Notice: To prevent from device damage, please use the bundled AC Adapter before power on your Switch. And never use any other