B. Connect the other end of the cable to the network devices such as printer servers, workstations or routers…etc.
| Connection to the Switch requires UTP Category 5 |
| network cabling with |
Note | please see the Cabling Specification in Appendix A. |
|
|
Step 5: Supply power to the Switch.
A. Connect one end of the power cable to the Switch.
B. Connect the
When the Switch receives power, the Power LED should remain solid Green.
11