SpectraLink 6100 MCU: Installation and Operation: SpectraLink 6000 System
PN: 1725-36097-001_G.doc
10
Installation Steps and Responsibilities 9 Task
Description Wire Contractor
or Electrician Field Service
Engineer Customer Project
Mgr/ System Admin
Site Preparation
Determine location of MCU 9
Run Cable for System
Run cable to Base Station
locations
9
Pull cable 9
Terminate cable at Base Station
locations
9
Prepare and install demarc blocks 9
Assign and program ports 9
Connect cables to demarc blocks 9
Install SpectraLink System
Survey site and check
components
9
Install MCUs 9
Install Base Stations 9
Install outdoor Base Stations 9
Connect and register handsets 9
Set up diagnostic modem 9
Register handsets 9
Program handset features 9
Test handsets 9
Site certification 9