ASSEMBLY / PRE-OPERATION

TRACTION DRIVE

RETAINER

CONTROL LEVER

SPRING

TRACTION

DRIVE

CONTROL

ROD

DRIVE

CONTROL

BRACKET

FIG. 4

INSTALL AUGER CONTROL ROD (See Figs. 5 and 6)

The auger control rod has the short loop on the end of the spring as shown.

1.Slide rubber sleeve up rod and hook end of spring into control arm with loop opening up as shown.

2.With top end of rod positioned under right side of control panel, push down on rod and insert end of rod into hole in auger control bracket. Secure with retainer spring.

AUGER

CONTROL

ROD

RUBBER

SLEEVE

CONTROL

ARM

LOOP

OPENING

UP

FIG. 5

AUGER

 

AUGER

CONTROL

RETAINER

CONTROL

ROD

LEVER

SPRING

 

 

AUGER

CONTROL

BRACKET

FIG. 6

INSTALL DISCHARGE CHUTE / CHUTE ROTATER HEAD (See Fig. 7)

NOTE: The multi-wrench provided in your parts bag may be used to install the chute rotater head.

1.Place discharge chute assembly on top of chute base with discharge opening toward front of snow thrower.

2.Position chute rotater head over chute bracket. If neces- sary, rotate chute assembly to align square and pin on un- derside of chute rotater head with holes in chute bracket.

3.With chute rotater head and chute bracket aligned, position chute rotater head on pin and threaded stud of mounting bracket.

4.Install 3/8 washer and locknut on threaded stud and tighten securely.

CHUTE

 

ROTATER

 

HEAD

3/8 LOCKNUT

 

3/8 WASHER

CHUTE

BRACKET

PIN

THREADED

STUD

ROTATER HEAD

MOUNTING

BRACKET

FIG. 7

6

Page 6
Image 6
Poulan PP1130ESA owner manual Install Auger Control ROD See Figs, Install Discharge Chute / Chute Rotater Head See Fig