Powermate PMC435003 Portability Kit Installation, Wheel Installation, Foot Installation, English

Models: PMC435003

1 12
Download 12 pages 57.65 Kb
Page 3
Image 3
PORTABILITY KIT INSTALLATION

PORTABILITY KIT INSTALLATION

TOOLS REQUIRED: 1/2” and 9/16" sockets and ratchets, block(s) of wood (minimum of 6” tall).

Refer to the parts list and drawing on pages 8 and 9.

WHEEL INSTALLATION

1.Block up end of generator opposite the fuel tank cap to install wheel kit.

2.Insert wheel spacer (item 43) into the center of the wheel (item 35).

3.Slide 3/8 x 3.5” bolt (item 41) through the wheel (item 35), then through the wheel bracket on the carrier, with the offset side of the wheel hub against the wheel bracket.

4.Thread 3/8 nyloc nut (item 42) onto the bolt and tighten to securely clamp the wheel assembly to the tubing.

5.Repeat above instructions for the remaining wheel.

FOOT INSTALLATION

1.Blocking up the engine side of the generator, place a spacer (item 38) and a foot (item 37) under the carrier channel. Thread a 5/16-18 x 2.75” bolt (item 36) through the mounting holes and thread a 5/16 washer (item 40) and a 5/16 nyloc nut (item 16) to the bolt to secure the foot to the carrier. Caution: Do not over tighten so that the foot material collapses.

2.Repeat step 1 for the remaining foot.

LOCKING HANDLE

1. Attach the lanyard (item 39) to the release pin 12 (item 44) and carrier as shown in the illustration.

2.To lock the handle (item 31) in the extended position, align the holes in the handle bracket with the holes in the carrier bracket and insert the release pin (item 44).

3.Insert caps (item 45) into ends of handle (item 31).

English

 

3

 

 

 

 

Page 3
Image 3
Powermate PMC435003 manual Portability Kit Installation, Wheel Installation, Foot Installation, Locking Handle, English