PBM-123L
LCD Projector Mount
INSTALLATION INSTRUCTIONS
Step 1
Invert the projector and place it on a soft and flat surface. Raise the front adjustment foot slightly slide the projector bracket under the foot. lower the foot snug against the bracket. Locate the 4mm mounting holes located on the bottom of the projector. Secure the mounting bracket with the two (2) 4mmx10mm min (supplied) Phillip screws tighten to
Do not over tighten!
Step 2
Install the base box securely to the ceiling structure in accordance with proper commercial standards. Use (commercially available) suitable hardware depending on the installation requirements.
NOTE: If the (optional)
Step 3
Install the two (2) hinge pin bolts loosely on both sides of the base box. Raise the projector with the mounting bracket attached and slip though the hinge pin slots openings on the bracket into the base box. Install the two (2) angle locking bolts. Adjust the angle, lock it, and then tighten the hinge pin bolts.
Do not over tighten!
Step 4
Check all the hardware for proper tightness and security.