Quasar HQ-2244UH Suggested Tool Requirements, Preparation Of Chassis, Features, and Installation

Models: HQ-2244UH

1 32
Download 32 pages 57.32 Kb
Page 11
Image 11
Suggested Tool Requirements

Suggested Tool Requirements

SCREWDRIVER(+, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL

PREPARATION OF CHASSIS

1.Remove the screws which fasten the cabinet at both sides and at the back.(See Fig. 1)

2.Slide the unit out from the cabinet by gripping the base pan handle and pulling forward while bracing the cabinet.(See Fig. 2)

3.Cut the window sash seal to the proper length. Peel off the backing and attach the Foam-PE to the underside of the window sash.(See Fig. 3)

Shipping screws

Fig. 1

4. Remove the backing from Foam-PE with 3 holes and attach it to the bottom of the Top retainer bar.(See Fig. 4)

5. Attach the Top retainer bar on the top of the cabinet with 3 screws (Type A).(See Fig. 4)

Fig. 2

Features

6.Insert the Frame Curtain into the Top retainer bar and Lower guides.(See Fig. 4)

7.Fasten the curtains to the unit with 10 screws (Type A) at both sides.(See Fig. 4)

 

Top retainer bar

Foam-PE

Foam-PE

Fig. 3

Top retainer bar

 

 

Lower guide

Screw

 

(Type A)

Screw(Type A)

 

Fig. 4

and Installation

11

Page 11
Image 11
Quasar HQ-2244UH operating instructions Suggested Tool Requirements, Preparation Of Chassis, Features, and Installation