USER INSTRUCTIONS C88
Thank you for purchasing the Reliab le™ C88 vacuum pressing table. Please
follow the instructions carefully. With proper care and maintenance, your
ironing table will provide years of dep endable service.
The C88 is equipped with a powerful and fast vacuum motor. The strong
vacuum will give you a clean-crisp fin ish to your garments, guaranteeing
professional results. The fast start up time means you won’t be waiting for
the motor to rev up to speed.
1. Unfolding: Hold the ironing board in a vertical pos ition with the tip
downwards; press the handle (5) placed underneath the board and lift up
the working surface by pulling wi th the foot outwards until the desired
height is reached.
2. Unfold the boiler support (3) and plac e the steam generator on the shelf.
3. Insert the electrical plug into an electrica l outlet.
4. Place the pedal (1) near the working area.
5. Push the on/off switch (2) on the “I” pos ition.
6. Wait for a few minutes until the workin g surface is warmed up.
7. Start ironing.
8. The vacuum function is controlled by the pedal (1)
9. You can use the vacuum function at the same time as you are ironing, or you
can use it after the ironing (for very light fabrics this may be the preferred
way).
10. At the end of the ironing we suggest you leave the on/off switch (2) on for
a few minutes to ensu re the inside of the table is dry and free of
condensation.
11. Folding: turn the on/off switch (2) off, remove the plug from t he outlet.
Take the boiler and the iron off of the boiler support (3), fold the boiler
support (3), and make s ure there is no garment on the working surface
and/or on the catch tray (4).
12. As soon as the working s urface is cool, p osition the ironing board
vertically with the tip downward s, press the handle (5) placed under the
working surface and at the same time pull the legs (6) inward.