Installation#Checklist

A.#Storage#tank#Location

B.#Water#Supply

C.##Relief#Valve

Close(to(area(of(heated(water(demand.
( Indoors(and(protected(from(freezing(
temperatures.
( Area(free(of(flammable(vapors.
( Provisions( made( to( protect( area( from(
water(damage.
( Sufficient(room(to(service(unit.
Storage( tank( completely( filled( with(
water.
( Air(purged(from(storage(tank(and(piping.
( Wate r(c on nec ti ons (ti gh t(a nd( fr ee( of( le aks .
Temperature(and(Pressure(Relief(Valve(
properly(installed(and(discharge(line(run(
to(open(drain.
Discharge(line(protected(from(freezing.
10

Safety#Precautions

(((This(storage(tank(will(not(control(the(
water(temperature.
(((Maximum((operating(temperature(of(
water(in(tank(=(170°(F.
(((Temperature(&(Pressure(Safety(Relief(
valve(opens(at:(210°(F,(and/or(150(
PSI..
((((Maximum(flow(rate(permissible(
through(ports(on(side(wall(of(tank(=(
20(GPM.
Operating#the#storage#tank.