Installation#Checklist
A.#Storage#tank#Location
B.#Water#Supply
C.##Relief#Valve
❑ Close(to(area(of(heated(water(demand.
(❑ Indoors(and(protected(from(freezing(
temperatures.
(❑ Area(free(of(flammable(vapors.
(❑ Provisions( made( to( protect( area( from(
water(damage.
(❑ Sufficient(room(to(service(unit.
❑ Storage( tank( completely( filled( with(
water.
(❑ Air(purged(from(storage(tank(and(piping.
(❑ Wate r(c on nec ti ons (ti gh t(a nd( fr ee( of( le aks .
❑ Temperature(and(Pressure(Relief(Valve(
properly(installed(and(discharge(line(run(
to(open(drain.
❑ Discharge(line(protected(from(freezing.
10
Safety#Precautions
(((This(storage(tank(will(not(control(the(
water(temperature.
(((Maximum((operating(temperature(of(
water(in(tank(=(170°(F.
(((Temperature(&(Pressure(Safety(Relief(
valve(opens(at:(210°(F,(and/or(150(
PSI..
((((Maximum(flow(rate(permissible(
through(ports(on(side(wall(of(tank(=(
20(GPM.
Operating#the#storage#tank.