11
Typical Installation
HOT
ALTERNATE SEDIMENT
TRAPLOCATION Hot Water Outlet
To Fixtures Roof Jack
Draft Hood
Anode
Flue Baffle
(Underneath)
Temperature
and Pressure
Relief Valve
Relief Valve
Discharge Line
to Suitable Drain
Drain Valve
Jacket Door
Thermostat
Sediment Trap
Sediment Trap
Manual Gas
Shut-Off
Ground Joint Union or
ANSI Design Certified
Semi-Rigid or Flexible
Gas Appliance Connector
To Gas Supply
To Gas
Supply
To Cold
Water Supply
Vacuum Relief Valve
(Not Supplied)
If required, install per local codes
and valve manufacturer’s
instructions.