
21
Rinnai Corporation RHFE-263FA
6.  Lock the ties 
  Pulling hard on the left and right hand ties, 
clip the ties over the notches inside the 
sleeve.  You should be able to pull the ties 2 
or 3 notches past the starting point.  Cut the  
ties, leaving about 3/4 inch (20 mm) past the 
notch.  Bend the ties back into the sleeve and 
parallel to the wall. 
7.  Insert Inside Connection Assembly 
Push the assemble into the terminal tube, 
ensuring that the seal is in place on the 
inner tube.
Attach the inside connection with 3 
screws.  The inner connection can still 
be turned to install the screws. 
4.   Install the Terminal 
  Check that the terminal seal is in place.  For 
weatherboard walls, add the second seal next 
to the terminal seal to compensate for 
weather board angle. 
  From the outside insert the terminal into the 
sleeve with the marking  TOP  at the top.  
The left hand side locking tie should be 
marked  LEFT . 
Terminal seal 
Locking tie 
Terminal 
Locking ties  Sleeve 
3 screws