Samsung AZ09F1KE manual Method of Installation, Checkpoints prior to installation

Models: AZ09F1KE

1 16
Download 16 pages 15.62 Kb
Page 14
Image 14
Method of Installation

Method of Installation

Before installation, be sure to check the installation area

for the air conditioner, and installation method of the drain hose.

Checkpoints prior to installation

1Check the cabinet and front grille of the unit for any harmful defects such as scratches.

2Be sure to check the power supply.

- Refer to the specifications on the label attached to the unit.

Installation Conditions

1As the unit is heavy, the wall or window of the installation area should have sufficient strength and durability for operation of the air conditioner, and for prevention of any vibration or noise.

If it is weak, reinforcement work should be performed separately.

2It is advisable to install the air conditioner in the north or west side to prevent the effect of direct sunlight.

When installing it in the south or east side due to unavoidable circumstances, it is advisable to install the sunshade to prevent the direct sunlight.

In this case, take care not to cause any hindrance to the flow of outside air.

3When installing the air conditioner, be sure to obtain sufficient space on the rear side of the unit for smooth flow of air.

When operating the air conditioner in closed areas such as inner building with cooling operation, and result in trouble with the unit.

See the illustration below.

 

 

Awning

 

 

85mm

 

 

 

min.

300mm

 

 

200mm

500mm

Fence, wall

500mm

500mm

 

or other

 

 

 

 

 

 

obstacle

 

 

Approx.3˚

 

750mm

 

150mm min.

 

If the wall is greater than 150mm thick,

cut the wall back on a 45˚ angle if possible.

45˚

45˚

100mm or more

E-14

Page 14
Image 14
Samsung AZ09F1KE manual Method of Installation, Checkpoints prior to installation, Installation Conditions