SAMSUNG Video Wall Kit Setup Guide

2. Installation

6.Assemble all the monitors (up to 4 monitors in a column) according to the same procedures, install the Top Bracket-Link, and then fasten all the screws of the connecting parts.

7. When the arrangement is complete, fix it to the floor with the screws.

N The parts used for the product assembly are as follows. ex) When monitors are constructed in a 2x3 stack.

8

Matrix_ID-Eng.indd Sec1:8

2010-06-08 ￿￿ 3:36:39

Page 10
Image 10
Samsung MID462UT2 manual MatrixID-Eng.indd Sec18 2010-06-08