7.Install the blower assembly to the mounting bracket and secure with the mounting pin. See Figure 3-4.
8.Align the blower assembly with the discharge opening of the cutter deck. Tighten the hardware for the mounting bracket. See Figure
9.Install the quick pin through the rear hole in the discharge chute mounting bracket. See Figure
BLOWER
ASSEMBLY
QUICK
PIN
HAIR MOUNTING
PIN BRACKET
MOUNTING PIN
TIGHTEN MOUNTING
BRACKET HARDWARE
RIGHT SIDE OF
CUTTER DECK SHOWN
(Note: Some parts not shown for viewing purposes.)
2006
FIGURE
10.Install the belt to the spindle pulley. When replacing the belt, see Figure
BACK SIDE
IDLER PULLEY BLOWER
PULLEY
FRONT SIDE | SPINDLE | |
PULLEY | ||
IDLER PULLEY | ||
|
FIGURE
11.Install the new belt covers and secure. See items number 1 and number 21 on page 10 of the Blower Mounting Components section in this manual for proper installation.
12. Install the LH & RH hopper mounting brackets to the outside of the frame on the rear of the machine and secure using six (6)
RH
Hopper
Mounting
Bracket
Rear Frame
Elastic Stop Nut
FIGURE
13.Remove the upper hex head bolt and serrated flange nut securing the support bracket to the frame of the machine. Retain the serrated flange nut for
Existing | ||
Nut | ||
|
Muffler Guard
FIGURE
3