Sears SR10095 Three-Wirecord Connection Kit, Level The Range, Oven Door Removal, INT30

Models: SR10095

1 4
Download 4 pages 27.3 Kb
Page 4
Image 4
THREE-WIRE CORD

THREE-WIRE CORD

CONNECTION KIT

Remove the screws on the junction block studs.

Install the thrse-wlre cord and the strain relief In the hole In the connection plate.

Connect the red and black leads to the outer terminals and the white lead to the center terminal.

Push the cord upward (to relieve strain), while tightening the strain relief clamp.

If local codes require an ungrounded neutral. Remove ground strap.

Fasten the white wire to the center terminal

Use grounding terminal or lead to ground unit In accordance with local codes.

GROUNDED

TERMINAL

SCREW

GROUND STRAP

GROUNDSCREW

CONNECTION

PLATE

LEVEL THE RANGE

Using the wrench, back out the four leg levelers st least two turns. See your Installation guide for more levallng

Information before positioning range.

The range must be level for proper cooking and baking. Install the oven racks (see Owner's Manual for

iestructlona).

Use a 1 3/8" open end wrench or an adjustable wrench to equally back out the four leg levelers two or three turns each.

OVEN DOOR REMOVAL

Before Installing the range, you may remove the oven door to lessen the welg ht of the unit. DO NOT lift unit by door handle.

To remove oven door.

1.Open the door to the stop posttion. See Fig. 5A.

2.Grasp the door at each side and lift up and off the hinges. See Fig. 5B.

Fig. 5A

Fig. 5B

STOP POSITION

HINGE

SR10095

 

 

 

Pub. No.31-10059

 

Recyc_Pa_

 

INT30_3

4

Printed in LaFayette,

Georgia --

Page 4
Image 4
Sears SR10095 installation instructions Three-Wirecord Connection Kit, Level The Range, Oven Door Removal, INT30