![](/images/new-backgrounds/1134124/13412439x1.webp)
a. INPUT TEST
This test displays the state of each switch & button. If the display goes ON when the switch or button is activated, the connection is satisfactory.
<<INPUT TEST>>
PLAYER | 1P | 2P |
UP | OFF | OFF |
DOWN | OFF | OFF |
RIGHT | OFF | OFF |
LEFT | OFF | OFF |
SHOT1 | OFF | OFF |
SHOT2 | OFF | OFF |
START | OFF | OFF |
PRESS TEST BUTTON TO EXIT
UP: | Changes to ON when inclining the LEVER towards the monitor. |
DOWN: | Changes to ON when inclining the LEVER towards you. |
RIGHT: | Changes to ON when inclining the LEVER towards the right. |
LEFT: | Changes to ON when inclining the LEVER towards the left. |
SHOT 1: | Changes to ON when pressing the SHOT1 (TOP SPIN) Button. |
SHOT 2: | Changes to ON when pressing the SHOT2 (SLICE SPIN) Button. |
START: | Changes to ON when pressing the START Button. |
Press the TEST Button to return to the TEST MENU screen.
|
| UP | |||
LEFT |
|
|
|
| RIGHT |
|
|
|
| ||
|
| ||||
|
|
|
| ||
|
|
|
|
|
|
DOWN
SHOT2
1P 2P SHOT1
START
|
| UP | |||
LEFT |
|
|
|
| RIGHT |
|
|
|
| ||
|
|
|
| ||
|
|
|
| ||
|
|
|
|
|
|
DOWN
SHOT2
SHOT1
CONTROL PANEL
www.seuservice.com | 18 |