
5.Names and Functions of Individual Parts
7.Basic wiring
9.Check flow
DC(+) |
Brown |
(PinNo.1) |
DC(+) |
Brown |
(PinNo.1) |
When detection failure occurs(stay ON/OFF), please check based on the next flow.
Indicator lamp
Lead wire
Mounting hole
D-F79W/F7PW/J79W/F7BAL
Switch | Load | |
main | OUT | |
Black | ||
circuit | (PinNo.4) | |
| ||
| Blue | |
| (PinNo.3) | |
| DC(+) | |
| ||
| Brown | |
| (PinNo.1) | |
Switch | OUT | |
Black | ||
main | ||
Load | ||
circuit | (PinNo.4) | |
| ||
| Blue | |
| (PinNo.3) |
| Switch | Load |
| main | OUT |
Power | Black | |
circuit | (PinNo.4) | |
supply |
| |
|
| Blue |
|
| (PinNo.3) |
|
| |
| Switch | DC(+) |
| main | Brown |
|
| |
| circuit | (PinNo.1) |
| Switch | OUT |
| Black | |
| main | |
| Load | |
Power | circuit | (PinNo.4) |
supply |
| |
|
| Blue |
|
| (PinNo.3) |
Power supply
Power supply
Trouble occurs |
|
| |
|
|
|
|
|
|
|
|
Trouble |
| Stay ON(Sometimes OFF) | |
condition |
| ||
|
| ||
|
|
|
|
Stay OFF(sometimes ON)
|
|
|
|
|
|
|
|
|
|
|
|
| |
Indicator light |
|
|
| Stay ON |
|
|
|
|
| Stay OFF | |||
|
|
|
|
| |||||||||
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| Source voltage |
|
|
| ||
Normal |
|
|
| ||||||||||
|
|
|
|
|
| or load voltage |
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| Normal | Abnormal | ||||
2wires / 3wires | 2wires | ||||||||||||
|
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
Indicator light Stay ON
Normal
2wires / 3wires
3wires 2wires
Indicator lamp
Lead wire
|
|
| DC(+) |
| DC(+) | |
| Brown |
| Brown | |
| Load |
| Load | |
| (PinNo.1) |
| (PinNo.1) | |
Switch |
| Switch |
| |
main | Power | main | Power | |
circuit | circuit | |||
supply | supply | |||
|
|
|
|
|
|
| Load spec.check(1) |
|
|
| Replace the Switch |
|
| ||||
3wires |
|
|
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Normal | Abnormal | Normal Abnormal | ||||||||
Wiring |
|
|
|
|
|
|
|
|
|
|
|
|
| ||
(output)check |
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Load spec.check(2)
Normal Abnormal
Mounting hole
6.How to mount / Mounting bracket
Each actuator has a specified mounting bracket when mounted to the auto switch. “How to mount/Mount bracket” depends on actuator type and tube I.D. Please refer to the actuator catalogue. When an auto switch is mounted for the first time, please ensure the actuator is of the magnet
Blue | Blue |
(PinNo.4) | (PinNo.4) |
|
|
DC(+) |
|
| DC(+) |
|
Brown |
|
| Brown |
|
(PinNo.1) |
|
| (PinNo.1) |
|
Switch |
| Switch |
|
|
main | Power | main |
|
|
circuit | circuit |
| Power | |
supply |
| supply | ||
Blue |
|
| Blue |
|
Load |
|
| (PinNo.4) | Load |
(PinNo.4) |
|
|
|
Normal Abnormal
A B A C D E B BA A F D
Load spec. check(1) | ON voltage > Load |
Load spec. check(2) | OFF current > Leak current |
A
B
C
D
E
F
Switch mounting screw
Switch mounting nut
Auto switch
Switch mounting screw
Switch spacer
8.Exterior dimension D-F79/F7P/J79
8 Mounting hole
Indicator lamp
15 | 4 |
| 7 |
23 | 4.6 |
|
|
Manufacturer’s batch marking
1 | 3.2 |
11 |
|
8.5 Most sensitive position | 6.2 |
Connector pin assignment
1 | 4 | 1 | 2 |
|
|
|
|
|
| 2 | 1 |
|
|
|
| 3 | 4 |
3 |
| 3 | 4 |
|
|
Exterior dimension of Pre-wired connector
D- PC BA | Connector size M8 |
| 10 |
Year
Mark Year
J2005 K 2006 L 2007 M 2008
Month
Mark | Month |
O | January |
P | February |
Q | March |
R | April |
S | May |
T | June |
U | July |
V | August |
W | September |
X | October |
Y | November |
Z | December |
Switch mounting nut
D-F79W/F7PW/J79W/F7BA
31.4 |
Slide the auto switch mounting nut inserted into the mounting rail and set it at the auto switch mounting position.
Fit the convex part of auto switch mounting arm into the concave part of auto switch mounting rail. Then slide the switch over the nut. (CDQ2 series:Fit the convex part of auto switch mounting arm through the auto switch spacer into the concave part of auto switch mounting rail.)
Push the auto switch mounting screw lightly into the mounting nut through the hole of auto switch mounting arm.
After reconfirming detection position, tighten the mounting screw to secure the auto switch. (Tightening torque of M3 screw should be 0.5 to 0.7N•m.)
Modification of the detecting position should be made in the condition
of .
8Mounting hole
Indicator lamp
15 | 4 |
| 7 |
23 | 4.6 |
|
|
Manufacturer’s batch marking | |
1 | 3.2 |
11 |
|
8.5 Most sensitive position | 6.2 |
D- |
| DPC | Connector size M12 |
|
14 |
44 |
AUSTRIA | (43) 2262 62280 | NETHERLANDS | (31) | 20 531 8888 | |
BELGIUM | (32) | 3 355 1464 | NORWAY | (47) 67 12 90 20 | |
CZECH REP. | (420) 541 424 611 | POLAND | (48) | 22 211 9600 | |
DENMARK | (45) | 7025 2900 | PORTUGAL | (351) | 21 471 1880 |
FINLAND | (358) 207 513513 | SLOVAKIA | (421) | 2 444 56725 | |
FRANCE | (33) 1 | 6476 1000 | SLOVENIA | (386) 73 885 412 | |
GERMANY | (49) | 6103 4020 | SPAIN | (34) | 945 184 100 |
GREECE | (30) 210 271 7265 | SWEDEN | (46) 8 603 1200 | ||
HUNGARY | (36) | 23 511 390 | SWITZERLAND | (41) | 52 396 3131 |
IRELAND | (353) | 1 403 9000 | UNITED KINGDOM | (44) 1908 563888 | |
ITALY | (39) 02 92711 |
|
|
|
URL http://www.smcworld.com (Global) http://www.smceu.com (Europe)
Specifications are subject to change without prior notice from the manufacturer. The descriptions of products in this document may be used by other companies. © SMC Corporation All Rights Reserved.