4-2 CU-F780/G780/E700/E672/F117
Capsule Black Assy Capsule Comple Pwb, Capsule Base AssyCapsule cushion MA-109 board
Red lead
White lead
Caution:
. When reinstalling the white and red leads,
slack off the leads as shown above and be
sure not to come in contact with each other
and the inside of the capsule cushion.
. After soldering the leads, apply bond (SC608-LUZ)
to the parts circled with a dotted line in the
illustration to keep the leads from breaking.
Precision
+K 1.4x3 (three) Terminal
Capsule base assy
Capsule base assy
Base screen
Capsule
complete pwb
Unfasten the three +K 1.4x3 screws and remove the
capsule complete pwb. Pull out the terminal of the
capsule base assy with tweezers.
Lug
White lead
Special screw
M 1.2x3
Terminal
Remove the base screen and the terminal. Unfasten
the M 1.2x3 screw and remove the lug. When removing
the white lead, apply toluene to the white lead and the
inside of the capsule base assy and remove the lead.
When reinstalling the white lead, apply a little of Sony
Bond Master to it.
Precision
+K 2x3 (two)
Red lead
White lead
Capsule
complete pwb
Capsule cushion
Capsule block assy
Chasis
Q01
Unfasten the two +K 2x3 screws and remove
the capsule block assy from the chassis.
(Torque: 1.4 kgfยทcm)