Installation
BEFORE SWITCHING ON POWER SUPPLY AND PQ, THE PQ MUST BE CONNECTED TO THE POWER SUPPLY WITH THE SUPPLIED MULTICORE LEAD. PAY ATTENTION TO A SECURE CONNECTION.
The PQ and the external power supply should be situated away from heat sources and direct sunlight. PQ and power supply need sufficient air circulation. Avoid instal- lation in environments exposed to vibrations, dust, heat, cold, moisture or electrical and magnetic fields.
Do not install the unit in proximity to power amplifiers or digital processors. You may consider placing it in a rack containing other analog gear. Such placement can prevent interference from Word Clock, Smpte, MIDI, etc.
•Do not open the case. You may risk electric shock and may damage your equip- ment.
•Leave repairs and maintenance to a qualified service technician. Should foreign objects fall inside the case, contact your authorized dealer or support person.
•To avoid electric shock or fire hazards do not expose your unit to rain or damp- ness.
•In case of lightning unplug the power supply. Please unplug the cable by pulling on the plug only; never pull on the cable.
•Never force a switch or knob.
•To clean the case use a
•Please support the back of the unit whenever it is being mounted into a 19 inch rack (especially important when touring).
Setting the appropriate supply voltage
The appropriate supply voltage (115 V/230 V) must be set on the rear panel of the external power supply. The fuse block (left from the power cord socket) can be inserted in two positions to meet your country‘s power requirements. Refer to the marks on the fuse block (triangles for both voltages) and insert the block with the appropriate triangle pointing to the white line on the fuse block case.
The power supply is fitted with 3,5 A fuses, slow blow.
Power-up sequence
It takes about four seconds until the
After finishing the
Ground Lift switch
A switch labelled „GND LIFT“ is placed on the rear panel of the power supply. It serves to eliminate hum problems. This switch physically separates chassis ground from AC ground; GND LIFT is activated (=chassis ground separated) when the switch points downwards.
4