7. Fill hole completely with concrete.

1" (2.54 cm)

IMPORTANT!: CONTINUE ON TO NEXT STEP.

DO NOT WAIT FOR CONCRETE TO CURE.

8. Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions several times while concrete is curing.

DRAINAGE HILL

1" (2.54 cm)

 

FILL TO

1" (2.54 cm)

HERE

PLAYING SURFACE

SIDEVIEW

IMPORTANT!: WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO

NEXT STEP. CONCRETE MUST CURE.

7

11/05

ID# 21112201

Page 7
Image 7
Spalding 21112201 manual Side View