Spalding manual ID# M880961 02/06

Models: M880961

1 16
Download 16 pages 25.38 Kb
Page 4
Image 4

4. Fill hole with concrete. Tamp down concrete to release air pockets and build drainage hill.

5. Insert J-bolts (1) from mounting plate (3) into cement as shown. Move assembly around to release any air pockets in cement, then rest mounting plate on cement drainage hill. Apply some pressure to level mounting plate on top of drainage hill. Level mounting plate and square with playing surface. Clean off any excess cement on mounting plate at this time.

IMPORTANT!

Front of mounting plate (3) must be parallel with playing surface.

WARNING!

DO NOT PROCEED UNTIL

CONCRETE HAS CURED! A

MINIMUM OF 72 HOURS. ALLOW

ADDITIONAL TIME FOR COLD,

WET OR HUMID WEATHER.

IMPORTANT!

Check leveling of mounting plate several times with carpenter’s level while concrete is curing.

PLAYING SURFACE

3

1

ID# M880961

02/06

4

Page 4
Image 4
Spalding manual ID# M880961 02/06