4. Fill hole with concrete. Tamp down concrete to release air pockets and build drainage hill.
5. Insert
IMPORTANT!
Front of mounting plate (3) must be parallel with playing surface.
WARNING!
DO NOT PROCEED UNTIL
CONCRETE HAS CURED! A
MINIMUM OF 72 HOURS. ALLOW
ADDITIONAL TIME FOR COLD,
WET OR HUMID WEATHER.
IMPORTANT!
Check leveling of mounting plate several times with carpenter’s level while concrete is curing.
PLAYING SURFACE |
3
1
ID# M880961 | 02/06 | 4 |