SPX Cooling Technologies F400 Spare Parts, Seasonal Shutdown Instructions, Mechanical Equipment

Models: F400

1 20
Download 20 pages 36.76 Kb
Page 12
Image 12
Spare Parts

Spare Parts

SPX Cooling Technologies manufactures and maintains a stock of re- placement parts for all cooling tower mechanical equipment. Shipment of these parts are normally made within ten days after an order is received. If emergency service is necessary, contact the local Marley representative for assistance.

To prevent prolonged shutdown periods in case of damage to the me- chanical equipment, it is suggested that the following parts be carried in the owner’s stock:

One fan assembly.

One Geareducer assembly.

One drive shaft assembly.

Be sure to furnish the tower serial number when ordering parts.

Seasonal Shutdown Instructions

Tower–Drain all tower piping.

During shutdown, clean the tower and make any necessary repairs. Ap- ply protective coating as required to all metal parts. Particular attention should be given to mechanical equipment supports, drive shaft and drive shaft guards.

Mechanical Equipment

Geareducer (shutdown for 3 months or less).

1.Each month, drain water condensate from the lowest point of the Geareducer and its oil system. Check oil level and add oil if necessary. Operate to recoat all interior surfaces with oil.

2.At start-up, drain water condensate and check oil level. Add oil if nec- essary.

Refer to Geareducer User Manual for maintenance and lubrication in- structions.

12

Page 12
Image 12
SPX Cooling Technologies F400 user manual Spare Parts, Seasonal Shutdown Instructions, Mechanical Equipment