SVL-A, SVL-B, SVL-C, & SVL-D Self-Contained Material Loaders - Venturi Style 15 of 49
2-3 Installing the Control Assembly
Install the control assembly at a freely accessible site. Check the length of the
connection cable and the length of the supplied hoses to the venturi assemblies.
During installation of equipment, check the length of the air supply lines. In some
cases, longer air supply lines may be required.
Figure 2.9: Control Assembly and Mounting Bracket
Shop Air To Venturi
Assembly
Control Mounting
Bracket