17
Step 35Moon Lid Placement
The Moon Lid [19] has two options for
installation:
Option 1. Sliding Moon Lid
Place one Moon Lid Panel inside the
roof header box. The single Moon Lid
Panel will slide back and forth in the roof
header box. This will provide a moon lid
that is partially open at all times as
shown in Diagram 35.
Option 2. Enclosed Moon Lid
Place both Moon Lid Panels in the roof
header box for a completely enclosed
roof.
Step 36Attaching the Lattice Privacy Panels
Pro Tip: You will need an assistant for
this step.
Position a Lattice Privacy Panel [8] in the
space between two lattices as shown in
Diagram 36.
Pro Tip: For professional looking results,
align the bottom of the privacy panel with
the spa rail.
Attach the privacy panel to the 2x3 upright
using two 2-1/2" screws. Attach the remain-
ing two privacy panels in the same manner.
Sundance Spas Gazebos Installation Instructions WillowWood
Align bottom of panel
with rail of hot tub
Diagram 35
Diagram 36