TRIVIEW | RACK MOUNT KIT |
| Installation Instruction |
Warning: 1. At least two persons are necessary to mount the monitorontherack. 2. Donotuseover forceonthescrews.
TRK
Instructions:
1.Go to step 2 if did not purchase handle
th e screws (M4x12mm) provided,see Fig. 1.
2.Tak e off 4 screwsfrom leftandrightsideofthemonitor,(thesescrewsnotusedagain).
3. Insta ll TRK
4.Mou nt the whole set onto the rack frame by using 6 piecesscrews: M5,length10mm,panortrus s head, phillips drive. (these screwsareprovidedbyrackmanufacturer), see FIG. 3 below.
Note s:
1.Standard 19"ope n rack model:
stock.
2. The gap between monitors or other equipments can be covered by blank panel or vent panel, 1U, | ||
2U, 3U available. (Contact salesperson for detail) |
| |
| 6.0" |
|
|
| 19" Standard Open Rack |
| Model | |
|
| |
12.25" |
|
|
|
| |
FIG. 1 |
|
|
FIG. 2 | FIG. 3 | |
TATUNG COMPANY OF AMERICA, INC |
|
|
2850 EL PRESIDIO ST, LONG BEACH, CA 90810 |
|
|
TEL: 310.637.2105 FAX: 310.631.4758 |
|
|