IHA0518

IHA0519

IHA0514

IHA0515

IFA0188

IHG0015

IHA0519

IHA0514

 

4x

 

 

 

MOULDINGS PREPARATION AND INSTALLATION.

PRÉPARATION ET INSTALLATION DES MOULURES.

PREPARACION Y INSTALACION DE LAS MOLDURAS.

IHA0518

INSTALL ALL MOULDINGS BEFORE THE DOWELS DRY.

COMPLÉTER L’INSTALLATION DES MOULURES AVANT QUE

LES CHEVILLES DE BOIS NE SECHENT.

COMPLETAR LA INSTALACION DE LAS MOLDURAS DURANTE

LOS CLAVIJAS DE MADERA ESTEN HUMEDOS.

TOP SHELF INSTALLATION.

INSTALLATION DE LA TABLETTE SUPÉRIEURE.

INSTALACION DE LA TABLA SUPERIORE.

IFA0188

4x

IHA0515

FOR RIGHT OPENING

POUR OUVERTURE A DROITE

PARA ABRIRSE A LA DERECHA

FOR RIGHT OPENING

POUR OUVERTURE A GAUCHE PARA ABRIRSE A LA IZQUIERDA

IHG0015

Page 5
Image 5
Tech Craft SF50 Mouldings Preparation and Installation, Preparacion Y Instalacion DE LAS Molduras, TOP Shelf Installation