|
|
| Quick Start List for |
5) | Connect the |
| pin through a normally open switch to GND. |
SHUTDOWN | |||
6) | Connect an |
-Power Up
7)Verify correct voltage and input polarity and set the external power supply to on.
The EVM begins operation.
8) Adjust the signal source level as needed.
Operation2-5