CPSFM-200
Installation
NOTE: The
To install the
1.Remove and retain the two (2) screws that secure the protective plate to the chassis.
2.Pull the plate away from the chassis.
I 0
3.Carefully slide the fan module into the installation slot, aligning the module with the installation guides.
I 0
4.Ensure that the fan module is firmly seated inside the chassis.
5.Carefully install the two (2) screws (retained in step 1) through the fan module and into the chassis, rotating clockwise to secure.
6.Verify that the fan module is powered by observing the fan operation.
Technical Specification
For use with Transition Networks Model
Standards | FCC & CISPR Class A&B; CE Mark | |
Dimensions | 8.3" x 8.4" x 2.7" (211 mm x 211 mm x 69 mm) | |
Weight | 1 lb. (0.45 kg) (approximate) | |
Power Consumption | 4.5 watts |
|
MTBF | 145,000 hours (MIL217F2 V5.0) | |
| 639,000 hours (Bellcore7 V5.0) | |
Environment | Tmra*: | 0 to 60°C (32 to 140°F ) |
| Storage Temperature: | |
| Humidity: | 5 to 95%, non condensing |
| Altitude: | 0 to 10,000 feet |
Warranty | Lifetime |
|
*Manufacturer’s rated ambient temperature: Tmra range for this fan module depends on the physical characteristics and the installation configuration of the Transition Networks PointSystem™ chassis in which this module will be installed.
Contact Us
Technical Support
Technical support is available 24 hours a day.
US and Canada:
International: 00-1-952-941-7600
Transition Now
Chat live via the Web with Transition Networks Technical Support. Log onto www.transition.com and click the Transition Now link.
Transition Networks provides seminars via live
Ask a question anytime by sending an
Address
Transition Networks
6475 City West Parkway Minneapolis, MN 55344, USA telephone:
fax:
2 | Tech Support: | techsupport@transition.com | 3 |