
INITIAL
Once installation and leveling is complete, the unit is ready for initial
ICE
O F F
C L N
ICE
O F F
C L N
CYCLE SELECTOR SWITCH
UL316B
Figure 26
1.Plug the appliance cord into a 115V polarized and grounded elec- trical outlet.
2.Open the water supply valve in the main water source.
3.Put the cycle selector switch in the ICE/ON position. The water fill valve will energize and fill the water reservoir. The water fill valve shuts off after 180 seconds. The compressor begins to operate and water flows over the evaporator assembly (ice cube tray).
4.Upon initial
It is possible that dirt or scale will dislodge in the water line. Always throw away all ice cubes made during the first two to three hours of operation.
23