INSTALLATION D
| DUCT |
| WORK |
2" MINIMUM |
|
CLEARANCE | 11 PCS |
| |
| (OPTIONAL PLENUM |
| FAN CONTROL LOCATION) |
| COLD AIR |
| RETURN |
FURNACE PLENUM | |
| |
FLAPPER |
|
| EXISTING FURNACE |
SOLID FUEL
FURNACE
INSTALLATION E
DUCT |
WORK |
2" MINIMUM |
CLEARANCE |
BAFFLE |
COLD AIR |
RETURN |
FURNACE PLENUM |
EXISTING FURNACE
SOLID FUEL
FURNACE
22