STORAGE TOWER

1. Attach the storage tower

structure to its SmartPointTM

track. You will hear a ‘click’

sound to indicate the structure

is secure.

After the above steps, connect these pieces to the included track pieces. You can configure them into different arrangements.

GETTING STARTED

BATTERY INSTALLATION - TRAIN

1.Make sure the unit is turned OFF.

2.Locate the battery cover on the bottom of the

unit. Use a screwdriver to loosen the screw.

3. Install 3 new AAA (AM-4/LR03) batteries following the diagram inside the battery box. (The use of new alkaline batteries is recommended for maximum performance.)

4. Replace the battery cover and tighten the screw to secure.

Getting Started

6

Page 7
Image 7
VTech 91-002858-007 user manual Getting Started, Storage Tower, Battery Installation Train