
Assembly Instructions
Deck Discharge Shield Installation (Side Discharge Models Only)
Attach the deck side discharge shield by positioning the shield hinge lug in front of the deck mount and fastening with two (2)
WARNING
DO NOT operate the machine without the grass deflector chute attached and in the lowest possible position.
Attach Shield
Discharge Shield Installation
on Side Discharge Deck
PTO Shaft Guard Installation
Position the shaft guard and mount with two (2)
Mount the two (2)
Attach Spring
Roller Wheels
Installation on Rear Discharge Deck
Mower Deck Installation on Tractor
Deck Installation
1.Lightly grease each deck support arm (2) on the tractor. Refer to Mower Deck Installation photo for location of deck support arm.
2.Engage the deck carrier frame tube sockets on the tractor support arms (refer to Discharge
Chute and PTO Shaft Guard Installation photo for socket location), slide the deck onto the support arms approximately 3 in. (76 mm).
3.Retract
Quick Coupler
Installation Tool
PTO Tube
Pull Back
Coupler Ring
Quick Coupler Installation Tool
23