
Assembly Instructions
PTO Shaft
Pilot End
Arrows
PTO Coupler
Spline Connection
To Tractor
Align PTO Shaft and PTO Coupler
(shown before engaging snowblower mounting
tubes with tractor support arms)
b.Slide snowblower assembly onto tractor. Reaching under the tractor, pull the ring back on the PTO quick coupler, slide the coupler onto the tractor spline shaft, and release the coupler ring.
IMPORTANT: To prevent damage to the machine, make sure the PTO quick coupler is securely locked on the tractor, with the locking balls fully seated in the groove and the ring in the full forward position (refer to the Coupler Ring “Locked” Position pho- to). After installation, pull on the shaft to check for security.
Pull Back
Coupler Ring
Installing PTO Quick Coupler
In Full Forward Position
Coupler Ring “Locked” Position
8.Insert the hitch pins in the ends of the tractor support arms.
9.Pull the lift handle back, press the foot trigger, and push the snowblower lift handle forward against the spring pressure into the DOWN (for- ward) position. Attach each of the lift chains to the lift brackets with a
NOTE: Use a bungee cord or strap to secure lift handle in forward position while connecting lift chains to tractor.
10.Reinstall the PTO cover.
Lift Bracket
Lift Chain
Hitch Pin
Attach Lift Chains to Lift Brackets
12