Reinstall control panel (after checking for gas

Install Right Work Surface

 

leaks)

You will need right work surface, two 1/2 inch bolts,

(1)

Set the control panel in place over both sides of

two nylon washers and a 7/16 inch or adjustable

 

the frame. Hold the crossover ignition button up

wrench.

 

 

while setting the control panel in place.

Insert the right work surface tabs in the slots In the

(2)

Line up the control panel with the white plastic

frame(1). Slip washers on the bolts and insert the bolts

 

plugs in the frame brace. Insert screws and tighten

as shown(2). Tighten

 

 

with a Phillips screwdriver until snug. Do not

 

 

 

overtighten.

 

(2)

(3)

Push each of the burner control knobs onto their

(1)

 

 

valve.

 

 

(4)

Reinstall Side Burner cover.

 

 

(1)

(3)

(2)

C-4

Page 16
Image 16
Weber Platinum B manual You will need right work surface, two 1/2 inch bolts