CSD-1ControlSystem–Propanegas

VII Operating instructions

Starting

boiler

A.This boiler is equipped with a pilot which must be lighted by hand. When lighting the pilot, follow these instructions exactly. The gas supply to this pilot is controlled by Pilot switch box. This boiler is also equipped with an ignition device which automatically lights a second pilot. The gas supply to this pilot is controlled by the Gas control. Do not try to light this pilot by hand.

B.BEFORE OPERATING THE MANUAL PILOT, smell all around the appliance area for gas. Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor.

WHAT TO DO IF YOU SMELL GAS

Do not try to light any appliance.

Do not touch any electric switch; do not use any phone in your building.

Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions.

If you cannot reach your gas supplier, call the fire department.

C.Do not use this appliance if any part has been under water. Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas control, which has been under water.

This document is intended only as a supplement to the LGB Gas-Fired Boiler Manual. Follow all instructions in the Manual, including those regarding start-up (found in Section VIII, “Placing boiler in operation”).

1. STOP! Read the safety information above.

2. Set the Operating control to lowest setting.

3. Turn off all electrical power to the appliance.

4.Remove the Base access shield.

5.Close the Pilot shut-off valve connected to Manual main shut-off valve. Close Manual main shut-off valve.

6.Wait five (5) minutes to clear out any gas. Then smell for gas, including near the floor. If you smell gas, STOP! Follow“B”in the safety information above. If you don’t smell gas, go to the next step.

7.Open the Pilot shut-off valve.

8.Press and hold the reset lever on the Pilot switch box. Manually light the

pilot while holding the lever down. Air in the gas supply line will have to purge through the line before sufficient gas will reach the pilot.

9. After purging all air, hold the Pilot switch box lever for about 1 minute to heat the thermocouple.

10.Release the Pilot switch box lever. The pilot should remain lit.

11.Open the Manual main shut-off valve and follow the sequence below.

12.This appliance is also equipped with an ignition device which automatically lights the second pilot. Do not try to light this pilot by hand.

13.Turn on all electric power to the appliance.

14.Set Operating control to desired setting.

15.If the appliance will not operate, turn off gas to the appliance by closing the Manual main shut-off valve and Pilot shut-off valve. Call your service technician or gas supplier.

16.Replace Base access shield and Front panel.

Part Number 550-141-816/0798

11

Page 10
Image 10
Weil-McLain 6-20 Series operating instructions VII Operating instructions, Starting Boiler

6-20 Series specifications

The Weil-McLain 6-20 Series is designed to meet the heating needs of residential and commercial properties with exceptional efficiency and reliability. This versatile steam and hot water boiler series is known for its robust construction and innovative technologies, making it a preferred choice among heating professionals.

One of the main features of the 6-20 Series is its durable cast iron construction, which ensures longevity and superior performance. The cast iron sections provide excellent heat retention, allowing the boiler to efficiently transfer heat to the water or steam, thus enhancing overall energy efficiency. The design is optimized to withstand high pressure and temperature, making it exceptionally resilient under demanding conditions.

Efficiency is at the heart of the 6-20 Series, with models designed to achieve high Annual Fuel Utilization Efficiency (AFUE) ratings. These efficiencies are made possible through advanced combustion technology and smart controls that monitor and adjust the heating process based on real-time needs. This not only conserves fuel but also reduces greenhouse gas emissions, supporting environmentally-friendly heating solutions.

Another significant advancement in the Weil-McLain 6-20 Series is its integrated control system. The advanced boiler control features programmable settings that allow users to customize their heating cycles, enabling better management of energy consumption and operational costs. Furthermore, the boiler comes equipped with a state-of-the-art burner system that ensures clean and efficient combustion, contributing to reduced maintenance needs.

The 6-20 Series also prioritizes user-friendliness, with installation and maintenance simplified through thoughtful engineering. Its compact design allows for flexibility in placement, whether in basements, mechanical rooms, or other areas with limited space. The high-quality insulation minimizes heat loss, further enhancing efficiency and performance.

Safety features are robust in the Weil-McLain 6-20 Series, ensuring peace of mind for homeowners and building managers. Integrated safety controls help monitor the pressure and temperature levels, preventing potentially hazardous situations and ensuring optimal operation.

In conclusion, the Weil-McLain 6-20 Series stands out with its combination of rugged construction, leading-edge technology, and user-oriented design. Whether for residential or commercial applications, its efficient performance and commitment to safety make it a reliable choice for heating solutions.