GO SERIES BOILER
SUGGESTED SPECIFICATIONS
I.General Requirements
A. Furnish and install |
| (qty) low pressure, natural draft, cast iron sectional boiler(s). |
B.Install boiler unit(s) in compliance with manufacturer’s installation instructions. All work must be done in a neat and workmanlike manner.
C. |
| (qty) P/B/A (circle one) W/WT/S (circle one) GO - |
| (size) |
boiler(s) capable of burning | No. 2 fuel oil. “P” boilers not available for sizes |
|
D.Boiler assembly:
1.“P” Boiler(s) (not available for sizes
2.“B” Boiler(s) cast iron sections to be factory assembled with jacket. Circulator, burner, and controls to be packed separately and assembled at job site. Jacket not installed on sizes 7- 9.
3.“A” Boiler(s) cast iron sections to be factory assembled with jacket. Circulator and controls to be packed separately and assembled at job site. Jacket not installed on sizes
E.Boiler(s) to be either water (WGO or WTGO) or steam (SGO).
F.Boiler(s) shall be 85% (water boilers) or 83% (steam boilers) minimum efficient as rated by D.O.E. seasonal efficiency (AFUE) and listed in the current GAMA Directory of Certified Ratings.
1.“Levittown” boiler(s)
G.Boiler(s) shall meet U.S. Environmental Protection Agency and Department of Energy guidelines for “ENERGY STAR” energy efficiency. (Does not apply to “Levittown” boiler(s) (P-
H.Boiler(s) shall have I=B=R Hydronics Institute gross output(s) at 100% firing rate MBH per boiler.
I.Boiler(s) shall be manufactured by an ISO 9001 registered company to conform to Section IV of the ASME Boiler and Pressure Vessel Code.
1.Individual sections and section assembly shall undergo hydrostatic pressure test at factory in accordance with ASME requirements for 50 PSIG working pressure and cast as part of section with ASME symbol.
500 Blaine Street
Michigan City, IN
http://www.weil-mclain.com
Page 1 of 4 |