Note: Read entire instruction sheet before you start installation and assembly.
WARNING
•Do not begin to install your Westinghouse product until you have read and understood the instructions and warnings contained in this Installation Sheet. If you have any questions regarding any of the instructions or warnings, please call customer care at
•This product should only be installed by a qualified professional.
•Make sure that the wall will safely support the combined load of the equipment and all attached hardware and compo- nents.
•Never exceed the Maximum UL Load Capacity of 80 lb (36.3 kg).
•If mounting to wood wall studs, make sure that mounting screws are anchored into the center of the studs. Use of an "edge to edge" stud finder is highly recommended.
•Always use an assistant or mechanical lifting equipment to safely lift and position equipment.
•Tighten screws firmly, but do not overtighten. Overtightening can damage the items, greatly reducing their holding power.
Tools Needed for Assembly
•stud finder ("edge to edge" stud finder is recommended)
•phillips screwdriver
•drill
•1/4" bit for concrete and cinder block wall
•1/2" bit for metal stud wall
•5/32" bit for metal or wood stud wall
•level
Accessories |
| |
• | Metal Stud Fastener Kit (ACC 215) (Not evaluated by UL) |
|
• | Video Conferencing Shelf (ACC 309) (Not evaluated by UL) |
|
• Accessory Shelves (PM 600, PM 610) (Not evaluated by UL) |
| |
Table of Contents |
| |
Parts List | 3 | |
Installation to Single Wood Stud Wall | 4 | |
Installation to Solid Concrete or Cinder Block | 5 | |
Attaching Adapter Plate to Flat Panel Screen | 6 | |
Installing and Removing Flat Panel Screen | 7 | |
Adjusting the Tilt Angle of the Flat Panel Screen | 7 |
For customer care call
2 of 8 | ISSUED: |