12 pg_W-135_EFS 6/8/07 6:23 AM Page 4

MOUNTING AND WIRING INSTRUCTIONS

NOTE: Underwriters Laboratories (UL) does not require all fixtures to have ground wires. These fixtures meet all UL specifications.

1.Turn off power at circuit box to avoid possible electric shock.

2.Secure mounting bar (A) to outlet box (B) with outlet box screws (C) (not included) (see fig. 1).

3.Thread hex nut 1 (D1) onto mounting nipple (E) approximately 1/4 inch and insert lock washer (F), then thread mounting nipple (E) onto mounting bar (A) and secure with hex nut 1 (D1).

4.Thread nipple 1 (G1) onto coupling 1 (H1).

5.Secure fixture loop (J) to fixture cover (I).

NOTE: Do not twist or kinkwires.

6.Thread hex nut 2 (D2) onto nipple 2 (G2), then thread nipple 2 (G2) into coupling 2 (H2) on fixture base (K) and secure with hex nut 2 (D2).

7.Open one link on bottom end of chain (L). Attach to fixture loop (J). Securely close link on chain (L).

8.Thread screw collar ring (M) onto screw collar (N), then place canopy (O) over top of screw collar (N).

9.Lace wires up through every other link on chain (L) then through screw collar (N), canopy

(O) and mounting nipple (E).

10.Open one link on top end of chain (L). Attach to loop on screw collar (N). Securely close link on chain (L).

11.Identify color coding of fixture wires (see fig. 2).

12.To connect wires, take black fixture wire (group A from fig. 2) and place evenly against black outlet box wire. Do not twist wires.

13.Fit wire connector (P from fig. 1) over wires and twist until there is a firm connection. If wire connector (P) easily comes off, reattach and check again for a firm connection.

14.Repeat steps 12 and 13 with the white (group B from fig. 2) fixture wires and outlet box wires.

15.Partially thread green grounding screw (Q) into side hole (R) on mounting bar (A) (see fig. 1).

16.Wrap ground wire from fixture around green grounding screw (Q) leaving enough excess wire to then connect ground wire and outlet box wire with wire connector (P) (see step 13) (if applicable).

17.Tighten green grounding screw (Q). Do not over tighten.

18.Remove screw collar ring (M) from screw collar (N) and secure screw collar (N) to mounting nipple (E).

19.Tuckwires inside outlet box (B).

20.Raise canopy (O) to ceiling and secure screw collar ring (M) to screw collar (N).

FIXTURE ASSEMBLY INSTRUCTIONS

1.Install lamps. Do not exceed recommended wattage.

2.Raise glass shade (S) up to fixture cover (I) with nipple 2 (G2) protruding through opening in glass shade (S).

3.Carefully support glass shade (S) while placing cover (T) and bottom break (U) over nipple 2 (G2) and secure with finial (V).

4.Turn power back on at circuit box.

4

Page 4
Image 4
Westinghouse W-135 owner manual Mounting and Wiring Instructions, Fixture Assembly Instructions