P. Making The Electrical Connection
1.Remove stainless Baffle filters. (
2.Remove screws on wiring case,
fish out wires through the knockout. (Fig.12)
3.Mark the electrical connection by fastening all wires to the existing wall wiring according to the their colors. (Black to Black, White to
White, Green to Ground) | Fig.12 |
4.After connection is done, reinstall wiring case cover and bottom board.
5.Turn on power and check operation of fan and light.
6.After completely installation, reinstall the stainless Baffle filter and oil collector. ( Ref.
Q.Use and Care
Night light sensor
OFF
Main power | 3 speed fan selection | Fan OFF | LED light |
1. Main power button
NOTE: ALL FUNCTIONS CAN BE WORKED ONLY UNDER THE
MAIN POWER IS ON.
A. By pressing
B. By pressing
, all functions are
again, all functions will be turned off.
15