Woodstock W1777 owner manual Operations, Loading, Operating, To load your nailer, do these steps

Models: W1777

1 20
Download 20 pages 5.42 Kb
Page 10
Image 10

Model W1777 212" 16 Gauge Finish Nailer

OPERATIONS

Loading

When replacing nails in your Model W1777, follow these guidelines:

Gauge:

16

Length:

114"–212"

Capacity:

74

To load your nailer, do these steps:

1.DISCONNECT NAILER FROM THE AIR SUPPLY!

2.Grip the nailer firmly, and pull the magazine pusher back until the catch lever engages, as shown in Figure 2.

Pusher

Catch

Lever

Figure 2. Sliding magazine pusher back to

engage catch lever.

3.Insert a strip of nails, pointed-end down, into the magazine, as shown in

Figure 3.

Figure 3. Loading nails into magazine.

4.Slide the nails all the way down to the nose of the nailer.

5.Release the magazine pusher by pulling back on the pusher and pressing in on the catch lever.

Operating

If you have not read the safety instructions in this manual, do not operate the nailer.

Before you operate your nailer, place five to six drops of the included oil into the quick connect fitting where the nailer connects to the air supply.

To operate your nailer, do these steps:

1.Connect the air supply to the quick connect fitting.

2.To test for proper nail penetration, hold the nailer perpendicular to the surface of a piece of clean scrap wood that is thick enough for the length of nails you have loaded.

-8-

Page 10
Image 10
Woodstock W1777 owner manual Operations, Loading, Operating, To load your nailer, do these steps