Xpelair SL100T, SL150HT, SL100HT manual SL100P and SL150P IPX4

Models: SL100 SL150 SL100T SL100HT SL150P SL100P SL150HT

1 4
Download 4 pages 43.35 Kb
Page 2
Image 2

SLIMLINE Series IPX4

INSTALLATION:

Begin the installation by making a circular opening of 100 mm (SL100), 150 mm (SL150) diameter in the ceiling or wall where the extractor is to be installed.

Remove the front cover (A) by removing screw (SL150 only) and pressing the catch (1) with the tip of a screwdriver until it is freed and then pulling it forward. Place the exhaust conduit (D) in the hole in the ceiling or wall for exhaust of the air.

Fix the base of the housing (B) in place using the plugs and screws provided. It may also be fixed to the interior of the ceiling using the 2 quickfit. Loosen the screws (4) until the wedges (5) are fully concealed in the housings

(6)and can be easily introduced inside the pipe. Tighten the screws until the wedges (5) firmly fix the extractor to the exhaust conduit.

Note: - All installations must be supervised by a qualified electrician. Installations and wiring must conform to current IEE regulations (UK), local or appropriate regulations (other countries).

— Do not install the exhaust pipe (D) of the extractor unit to a chimney, ventilation pipe or hot air conduit. Before connecting the unit to pipelines, consult the local municipal regulations regarding exhaust air and ask the permission of the person in charge of the building.

— Make sure that the ventilation is appropriate, especially when the extractor is used in conjunction with an appliance with a combustion chamber.

— This extractor is designed for the ventilation of homes or similar premises.

— Do not use in premises where the room temperature is above 40oC.

— This extractor does not cause any interference in radio/television sets (C.E.E. regulation No. 89/336).

ELECTRICAL CONNECTION:

The unit must be connected to a single phase mains power supply network at the voltage and frequency indicated on the rating plate of the extractor unit.

The electrical installation must include a double pole isolating switch with a distance between contacts of at least 3 mm. Make the electrical connection by loosening the screw (2) until the cover (3) is free and connect the power supply cables to the connection strip (E), the blue cable to N and the brown cable to L.

Replace the cover (3), fixing it in place with the screw (2) and finally press home the cover (A) until it is firmly held by the clip (7) and the catch (1) (Fig. T). Refit the screw (SL150 only).

The appliance must be permanently connected to a fixed electrical supply installation using twin conductor cable of at least 1 mm2 in section and a maximum of 1.5 mm2.

No earth installation is required as the appliance has double insulation. (Class II).

IPX4

NOTE: TIMER and HUMIDITY connection

Must he carried out by following the wiring diagram for SL100T / SL100HT / SL150HT.

Connect the wires to the connection strip by using a pointed instrument (the tip of a screwdriver for example) to apply pressure to (x) (xl, x2, x3) and pushing the striped wires (L. N, SL) into the holes (y) (yl, y2, y3).

SL100T IPX4

Adjust the timer by turning the knob (4) in a clockwise direction to increase the operating time (3’ – 15’).

SL100HT and SL150HT IPX4

Adjust the operating time by turning the red knob (4) in a clockwise direction.

Adjust the level of humidity by turning the blue knob (5) in a clockwise direction to increase the level.

The Slimline HT series incorporate a LED indicator. The LED is lit when the extractor is functioning either activated by the switch fitted to the appliance itself or another, exterior switch. When the extractor is activated by the level of humidity the LED is not lit. When the extractor is not operating the LED does not light.

SL100P and SL150P IPX4

This model is fitted with a Start/stop pull-switch (6) (Fig. P).

Page 2
Image 2
Xpelair SL100T, SL150HT, SL100HT manual SL100P and SL150P IPX4