Zanussi ZHC 913, ZHC 613 manual Fitting the Canopy Hood

Models: ZHC 613 ZHC 913

1 20
Download 20 pages 52.99 Kb
Page 13
Image 13

4.Draw a horizontal line through the vertical line at X. X is a distance between the centre of the top and bottom fixing holes on the upper chimney stack. Mark the centre positions for

the middle bracket fixing screws (3) at 95mm either of the vertical line (screws not supplied).

5.Drill the holes for the fixing screws using an 8mm masonary drill and fix the wall brackets using the plastic rawl plugs and 44mm screws provided. Ensure the lower bracket (1) is fitted with the lugs at the bottom.

Note: If the hood is to be installed onto a hollow construction or plaster or partition board wall then special fixing screws will be required (not supplied).

Fitting the Canopy Hood

1.Rotate the adjusting screws (R) on the canopy

(C) to about halfway.

2.Hook the canopy (C), onto the wall fixing bracket (1) and push down until the canopy adjusting screws (R) rest on the lugs.

3.To align or adjust the height of the canopy, use the two adjustment screws (R).

4.Before fitting the chimney to the canopy make the electrical connection as described in the section titled “ELECTRICAL CONNECTION”.

5.When the electrical connection has been made, test the three speed fan and worktop illumination.

13

Page 13
Image 13
Zanussi ZHC 913, ZHC 613 manual Fitting the Canopy Hood