INSTALLATION
INSTALLATION
DUCTING
SPECIFICATIONS
WARNING FIRE HAZARD
NEVER exhaust air or terminate duct work into spaces between walls, crawl spaces, ceiling,attics or garages. All exhaust must be ducted to the outside.
Use Metal ductwork only.
Fasten all connections with sheet metal screws and tape all joints w/ certified Silver Tape or Duct Tape.
Twister (AK8000AS)
Some Ducting Options:
side wall cap
w/ gravity damper
| side wall cap |
| w/ gravity damper |
Soffit or crawl | space |
5” | 1/16” |
| 1- |
26- |
|
19/32” |
|
27- | 10 |
9/16” | |
| |
| |
| 11 |
4-3/32”
BACK
Roof Pitch w/ |
Flashing & Cap |
|
|
FRONT | C/L |
cut out dimension
26-7/8”
10-5/8” (cut out)
(cut out) | = cut out dimension |
Page 2 | Page 3 |