Assembly
Place all parts of the hydrotherapy spa in a cleared area and remove the packing materials. Do not dispose of the packing materials until assembly is completed.
Assembly requires your own phillips screwdriver
1.Before beginning assembly, make sure that you have read and understand the information in the box above and on the previous two pages.
Remove the eight #10 x 2” Machine Screws (39). Carefully remove the Access Panels (25) and set them aside. Be careful not to damage the spa shell.
See the inset drawing. Insert the Pillow (38) into the lounge seat receptacle. Note: Rotate the Pillow 180º to change between the high and low positions.
2.Close the valve knob on the drain hose. Thread the cap onto the drain hose.
Locate the four gate valves inside the access open- ing (there are two gate valves per pump). Turn the gate valves counterclockwise to open them.
Make sure that the six collars are tightened (there are two collars per pump and two on the heater).
See step 1. Reattach the Access Panels (25) to the spa.
| . |
|
1 | 38 |
|
|
| |
39 |
|
|
| 25 |
|
| 25 |
|
| 39 |
|
2 |
|
|
| Gate Valve |
|
|
| Drain |
|
| Hose |
| Collar |
|
| Cap | Valve |
|
| Knob |
9