SET-UP AND ASSEMBLY
Before beginning assembly, carefully read the following information and instructions:
¥Place all parts in a cleared area and remove the packing materials from the spa shell; do not dis- pose of the packing materials until assembly is completed.
¥Assembly requires two people.
¥Read each assembly step before you begin.
¥During assembly, make sure that all parts are ori- ented as shown in the drawings.
TOOLS REQUIRED FOR ASSEMBLY:
¥Your own phillips screwdriver
¥You may also need a hammer
1.Before beginning assembly, be sure that you have read and understand the information in the box above and on the previous page.
Remove the two cover screws from the access cover. Remove the access cover from the Spa Unit (15) by sliding the access cover down and pulling the bottom of access cover away from the Spa Unit.
Be careful not to damage the spa shell.
Remove the Power Cord with the GFCI (9) from inside the Spa Unit (15).
2.Locate and check the position of the
MOTOR WILL BE DAMAGED IF IT IS OPERATED WITH THE
Close the valve knob on the drain hose. Thread the drain plug into the Pump Motor (11). Tighten the pump fittings.
3.Wipe out the spa shell using a damp cloth. Remove the two warning decals (not shown) from the spa shell. Before you fill the RESTORATION 2.0, be sure that it is in the position you want, and that it can be easily serviced, if needed. Once the spa is filled with water, it must be drained to be moved.
Using a garden hose or other clean water source, begin filling the RESTORATION 2.0. The water tem- perature does not matter; however, if you use warm or hot water, the spa will be ready to use sooner. Fill the spa, until the water reaches the fill line. Do not overfill the spa.
1 |
|
| |
|
| 15 | |
Access Cover | Cover Screws | 9 | |
2 |
|
| |
| |||
Valve |
| Valve | |
|
| 11 | |
Drain | Pump | Valve | |
Plug | |||
Fittings | |||
Knob | |||
| |||
|
| ||
Drain Hose |
|
| |
3 |
|
| |
Fill to Here |
|
8