GE DEH-211 manual Uninstalling Pmcs, Uninstalling the Pegasys System Log Service

Page 43

A screen will appear to indicate that you have successfully un-eLicensed and you may now take the eLicense Order ID for use on another PMCS installation.

*Please note that you can not retrieve an eLicense for re-use through the unlicense process past 3 years of initial Licensing.

Uninstalling PMCS

All PMCS software is provided with an uninstall utility to fully remove PMCS components from your system. Uninstalling PMCS will permanently delete any configuration information.

NOTE: The Uninstaller may not delete some files such as error logs, system logs, and configuration records, which are created after the PMCS installation is complete. Since these files are not part of the initial installation, they will not be removed by the Uninstaller, and must be deleted manually.

If you are uninstalling EPM 7700 components, be aware that the Pegasys System Log Service does not properly unregister itself as an NT Service. The following procedure will allow you to manually uninstall this component: the remaining PMCS software can then be uninstalled in the usual manner.

Uninstalling the Pegasys System Log Service:

1.Open a Command Prompt window.

2.Make the C drive the current directory (assuming your Windows system files reside on the C drive).

3.Type “slservice –e” EXACTLY as shown and hit enter.

4.If the Pegasys System Log Service was installed and running you will receive the message “Pegasys System Log Service stopped”. If you do not receive this

CIMPLICITY PMCS Read-This-Book-First

Installing the Software 41

Image 43
Contents Power Leader TM Enhanced MicroVersaTrip-C SR489 Generator Management Relay Back to Main Contents Configuring the Software Introduction How to Use this BookWelcome About Cimplicity Pmcs Version FeaturesPerformance Cimplicity Pmcs Read-This-Book-First Introduction Device Firmware Revision Supported Supported DevicesPage First Steps Getting StartedUnderstanding Terminology Cimplicity Pmcs Read-This-Book-First Getting Started Getting Started Cimplicity Pmcs Read-This-Book-First System Requirements Where to Get HelpWhat’s next? This page left blank intentionally Installing Cimplicity Installing the SoftwareComputer Preparation RS485 Pmcs Network Interfaces Installing Additional SoftwareEthernet Pmcs Network Interfaces Local Area Network LAN Interfaces Installing the EPM Software Components ELicensing Pmcs software Installing the Pmcs softwareLicensing via the Web Day TrialViewer Workstation Installation Host PC InstallationLicense by Phone Pmcs Installation Steps Cimplicity Pmcs Read-This-Book-First Installing the Software Installing the Software Cimplicity Pmcs Read-This-Book-First At the Choose Destination Default is C. Click Next Installing the Software Cimplicity Pmcs Read-This-Book-First Cimplicity Pmcs Read-This-Book-First Installing the Software Installing the Software Cimplicity Pmcs Read-This-Book-First Cimplicity Pmcs Read-This-Book-First Installing the Software Installing the Software Cimplicity Pmcs Read-This-Book-First Cimplicity Pmcs Read-This-Book-First Installing the Software Installing the Software Cimplicity Pmcs Read-This-Book-First Cimplicity Pmcs Read-This-Book-First Installing the Software Installing the Software Cimplicity Pmcs Read-This-Book-First Cimplicity Pmcs Read-This-Book-First Installing the Software Installing the Software Cimplicity Pmcs Read-This-Book-First PQ Analyst Installation Steps Installing the Software Cimplicity Pmcs Read-This-Book-First Cimplicity Pmcs Read-This-Book-First Installing the Software Un-elicensing Pmcs Uninstalling the Pegasys System Log Service Uninstalling PmcsInstalling the Software Cimplicity Pmcs Read-This-Book-First Reinstallation Steps Upgrading from previous versions to Pmcs Organize Your Information Configuring the SoftwareHost PC COM View NodeHost PC Configuration Configuration ProcedureViewer Workstation Configuration EPM Software Components Configuration Introduction EPM Device Special ConsiderationsCommunications Server System Communications Network Builder Building the Network Configuration FileEPM Software Components ION Designer Programming Devices and Software NodesWorkstation Configuration Guidelines Running Network Builder Configuring the EPM Device NetworkAdding a Workstation Building the Power-Monitoring Network in NetBuilderAdding Software Nodes Adding an Ethernet Site Page Saving and Exiting Adding Devices MetersThis page left blank intentionally What is an MMS Server? Using MMS Servers with PmcsInstallation for Windows NT Preparing the MMS Server for use with Pmcs Page Page Page This page left blank intentionally Index GE Industrial Systems

DEH-211 specifications

The GE DEH-211 is a cutting-edge digital electro-hydraulic (DEH) control system developed by General Electric to enhance the performance and efficiency of hydroelectric and steam turbine operations. Notably recognized for its reliability and advanced features, the DEH-211 integrates modern technologies to facilitate precise control of turbine operations.

One of the main features of the DEH-211 is its robust digital architecture, which allows for real-time data processing and system monitoring. This digital platform enhances the overall performance by providing faster response times and improved signal processing, which are crucial for maintaining optimal turbine performance under varying operational conditions.

The DEH-211 employs advanced control algorithms that enable superior speed governing and load control. This results in increased stability and reliability for turbine operation, helping to achieve optimal efficiency levels. The DEH-211 also integrates advanced feedback mechanisms, ensuring that the system can quickly adapt to changes in load and other operational variables.

Another noteworthy technology integrated into the DEH-211 is its digital communication capabilities. The system supports various communication protocols that facilitate seamless integration with existing plant control systems and other digital devices. This flexibility allows operators to achieve a higher level of automation and centralize control processes, ultimately leading to reduced operational costs.

The DEH-211 is designed with redundancy in mind, which is crucial for applications where system availability is paramount. The system features dual processors and dual communication paths, ensuring that there is a backup in place should any component fail. This redundancy not only enhances reliability but also instills confidence among operators regarding safe plant operations.

Additionally, the DEH-211 has been engineered for ease of use. Its user-friendly interface allows operators to monitor and manage turbine operations efficiently. Features such as graphical displays and intuitive controls enhance accessibility, enabling operators to make informed decisions quickly.

In summary, the GE DEH-211 stands out in the realm of turbine control systems due to its advanced digital technology, precise control capabilities, and emphasis on redundancy and reliability. With its ability to integrate seamlessly with existing plant infrastructure and promote enhanced efficiency, the DEH-211 is a formidable asset for modern power generation facilities seeking to maximize their operational potential. This system not only meets the demands of today's energy landscape but also positions itself for future advancements in turbine control technology.